Home > Project > FPSO Raia
  • FPSO
  • New-build
  • 2,900m
  • Spread Mooring
  • EPC
  • O&M

The SPA is a two-phase lump sum turnkey contract covering both Front End Engineering Design (FEED) and Engineering, Procurement, Construction and Installation (EPCI) for the entire FPSO. As Equinor and partners announced the Final Investment Decision (FID) on May 8,2023 after the completion of the FEED which had started on April 2022, MODEC has now been awarded phase 2 of the contract for EPCI of the FPSO. MODEC will also provide Equinor with operations and maintenance service of the FPSO for the first year from its first oil production, after which Equinor plans to operate the FPSO.

The FPSO vessel will be deployed at the Raia Manta and Raia Pintada fields, located in the giant 'pre-salt' region at the southern part of Campos Basin, approximately 200 kilometers off the coast of Rio de Janeiro, and permanently moored at a water depth of approximately 2,900 meters. The spread mooring system will be supplied by MODEC group company, SOFEC, Inc. Equinor's field partners are Repsol Sinopec Brazil (35%) and Petrobras (30%). The FPSO delivery is expected in 2027.

MODEC is responsible for the design and construction of the FPSO, including topsides processing equipment and hull marine systems. The FPSO will have topsides designed to produce approximately 125,000 barrels of crude oil per day as well as produce and export approximately 565 million standard cubic feet of associated gas per day. Its minimum storage capacity of crude oil will be 2,000,000 barrels.

The FPSO will apply MODEC’s new build, full double hull design, developed to accommodate larger topsides and larger storage capacity than conventional VLCC tankers, with a longer design service life.

Taking advantage of this larger topside space, this FPSO will be the second fully electrified FPSO equipped with Combined Cycle System for Power Generation which significantly reduces carbon emission compared with conventional Gas Turbine driven systems.


Unit NameFPSO Raia

FieldRaia Manta and Raia Pintada fields

CountryBrazil

HullNew-buildWater Depth2,900 m
Mooring TypeSOFEC Spread MooringStorage Capacity2,000,000 bbls
Oil Production125,000 bopdGas Production565 mmscfd
ClientEquinor Brasil Energia Ltda

ContractEPCI + O&M

Scope of WorkEngineering, Procurement, Construction and Installation (EPCI) and Operation & Maintenance (O&M)

Delivery to Client2027

First Oil2027

O&M Period1 year

Current StatusUnder Construction


Source: www.modec.com